Serving NYC, Bronx, New York City, Brooklyn
1-844-237-3440The Property Manager of a building located in Queens had noticed that the sidewalk in front of their building was uneven. About ten slabs were uneven causing multiple tripping hazards. Luckily the Property Manager found Quality 1st Basements System through their search internet and gave them a call. Systems Design Specialist, Jeffery Pitek, recommended PolyLevel to solve the issue. Project Manager, Sha Chon Kasey, injected PolyLevel into the sidewalk slabs which raised them back to level. PolyLevel can lift up to 4,000 pounds and has a quick cure time, allowing people to walk on the sidewalk in just a few minutes. With the tripping hazard removed, the property manager was now satisfied..